| Participation for realizing the "concept of an e-procurement-system" | | Pharma | big |
| Participation at the selection of transport-packing, reusable | | Commerce | big |
| Participation at the selection of a project-management-software | | Engineering | medium |
| Participation at the building-up of a controlling-system for the material management | | packaging-producer | big |
| Participation at the analysis to introduce a new software for stock management | | plastic part production | medium |
| Participation at an analysis, wether it would be effective to use own trucks for transport of purchased goods (reloading after distribution of goods) | | furniture industry | big |
| Participation at the optimization of the distribution of goods out of several production plants | | furniture industry | big |
| Participation at the building up of a management-information-system for the logistic | | sun reflector producer | big |
| Participation at the integration of an existing production planning and scheduling system into a SAP-system | | furniture industry | big |
| Participation at the optimization between the metal producing area and the metal using area | | foundry | medium |
| Simulation of a flexible production system | | machine tool industry | medium |
| Participation at the analysis of the investment into a welding robot | | truck producer | big |
| Simulation for the optimization of the planning of an automated storage center within a production area | | print-machine producer | big |
| Simulation and optimization of the production scheduling of an production area | | print-machine producer | big |
| Participation at the calculation and optimization of the tool-utilization and disposition | | truck producer | big |
| Participation at the reorganisation of a stock for model tools. | | foundry | medium |
| Building up of a scheduling software for a flexible production system through simulation of special machining situations. | | surface treatment | medium |
| Participation within a reorganisation of the scheduling within different production lines. | | automotive industry | big |
| Participation at the change of the material disposition | | paper production | big |
| Participation at the flexibilisation of a production combined with a stock level optimization | | paper production | big |
| Participatioin within a benchmarking of different scheduling strategies. | | Automotive industry | big |